Home

Company Overview

Mission Statement

Facility Features     Summary

Engineering

Quality Assurance        and Inspection     Equipment List

Equipment List

Major Customers     and Programs

Past Projects

Expansion Plan

Employment

Contact Us/     Vicinity Map







 
LARGE/SMALL ASSEMBLY TOOLS
EPTM - Size: 24 feet Tall, 50 feet Long - Material: Steel A36 - Time Frame: 12 months - Quantity: 1
EPTM

Rings ACS Panel Attachment Size: 100 inches X 50 inches – 88 inches X 50 inches - Material: Steel and Aluminum - Time Frame: 12 weeks - Quantity: 1
Rings ACS Panel

Installation Sling/Trolley - Size: 81 inches X 54 inches X 74 inches - Material: A36 Steel, 304 Stainless Steel - Time Frame: 12 Weeks - Quantity: 1
Installation Sling/Trolley

Winding Mandrel - Size: 60.0 inches Diameter x 55.0 feet Long - Material: 6061-T6 - Time Frame: 12 months - Quantity: 3
Winding Mandrel

Assembly Dolly - Size: 3 feet x 15 feet - Material: Aluminum - Time Frame: 12 Weeks - Quantity: 9 (3 Pieces)
Assembly Dolly

Check Fixture - Size: 2 feet x 6 feet - Material: 6061 Aluminum & A36 Steel - Time Frame: 16 Weeks - Quantity: 1
Check Fixture

Assembly Stand - Size: 102 inches x 100 inches x 12 feet - Material: A500, A36 - Time Frame: 2 Months - Quantity: 1 - Tool Parameters set with Laser Tracker
Assembly Stand

Booster Dolly Base - Size: Various - Material: 6061-T6 - Time Frame: 8 Weeks - Quantity: Multiple
Booster Dolly Base

Modal Simulator - Size: 8 ft Diameter - Material: A36 Steel - Time Frame: 4 months - Quantity: 1
Modal Simulator

Lifting Sling - Size: 15 feet x 15 feet x 15 feet (Cube) - Material: Aluminum - Time Frame: 3 ½ months - Quantity: 1
Lifting Sling

Bell Jar - Size: Large; 24 ft. Diameter, 12 ft. Tall, 12 Tons - Material: A36 Steel - Time Frame: 12 weeks - Quantity: 1
Bell Jar/Stand






BACK

 
Copyright (c) 2006 martinezandturek.com All rights reserved.